Monday 14 September 2015

Mobile Scaffolding Units

{Previously posted in LinkedIn group I created: Pre-Engineered manufactured structural Building products, and have since shut down. It having a membership of 30 people. Most of these people also in my group Pre-Engineered Manufactured Building Systems Group which has over 2000 members.}


Issues and concerns about mobile scaffolding units discussed here. Such units should only require selection, the design should be complete. However once placed into the market all products tend to become raw material and put to use beyond the intents of the designers. So the units can become for example the end supports for part of a scaffolding system, as boards are installed to bridge two units together. Are there adequate controls for design of what becomes a system, requiring installation design?